I had air compressor in storage, and tried to use it with the nail gun, and it would not work, so I had to go rent one.
I originally thought I would install Travertine Tile, but with all of the work with the subfloor, and cutting and setting all the tile, the floor would not have been the same height as the other floor in the hall and dining room.
So, the oak floor ended up looking and fitting better.
Next step, drywall, then paint the ceiling and walls....hang the cabinets!
No comments:
Post a Comment